We Don't Just Find Scratches. We Cite the Technical Rulebook.
Every entry in a Cantab schedule carries photographic evidence, a severity rating and the exact clause it breaches — formatted for the site project manager who has to action it.

Thermal & Insulation Deficiencies
Identifies cold-bridging, missing cavity insulation and unsealed perimeter frames under Approved Document L of the UK Building Regulations. We scan every external elevation, window reveal and underfloor heating zone.

Rooftop & High-Level Envelopes
Inspecting hard-to-reach elevations that standard walk-through inspectors cannot legally or physically access without scaffolding — ridge bedding, valley flashing, verge pointing and flue terminations.
Developer-Ready Action Schedules
Formatted specifically for site project managers. Every entry references the exact clause in the NHBC Standards Manual, leaving no room for site teams to dismiss issues as "within tolerance".
Item D-042 · Critical Compliance
Cavity lintel left uninsulated; continuous thermal bridge recorded at 4.1°C delta.
Cited: Approved Document L1A · NHBC Standards Ch. 6.1